Expo 2020

Expo 2020, now known as Expo City Dubai, is a mixed-use community located between Dubai and Abu Dhabi. It was initially developed to host the six-month global Expo event held from October 2021 to March 2022. Following the event’s conclusion, the site began transitioning into a permanent urban district with residential, commercial, cultural, and recreational functions. The area spans over 4 square kilometers and is designed to function as a walkable, integrated community. Current development efforts focus on repurposing existing infrastructure to support long-term residential and business use, including schools, hospitals, and office spaces. The location is connected by Dubai Metro’s Route 2020 and is positioned near Al Maktoum International Airport.

Public Amenities

Schools

A school is included in the master plan for Expo City Dubai, with an anticipated opening in the upcoming development phase. Currently, no schools are operational within the community, and families rely on nearby educational facilities in Dubai South and adjacent areas. Future educational infrastructure is designed to serve residents within a walkable distance.

Shopping Centers and Dining

Retail services within Expo City are concentrated in key areas, including Al Wasl Plaza and the Sustainability District. These include cafés, convenience stores, and dining outlets that were initially established during the Expo period. A wider range of shopping options is planned as the residential population grows; however, major malls are currently located outside the immediate community, such as the Dubai Outlet Village and Ibn Battuta Mall.

Hospitals

The long-term plan for Expo City includes two hospitals, one of which is expected to serve as a full-service medical facility. Currently, healthcare access is limited to clinics and hospitals in Dubai South and Jebel Ali. No hospital is currently operational inside the Expo site itself.

Outdoor Spaces

Expo City features dedicated open areas, including Expo Park and landscaped walkways surrounding the former national pavilions. The site features designated jogging and cycling tracks, public seating areas, and green corridors integrated throughout. These outdoor spaces are publicly accessible and support daily recreation for residents and visitors.

Transport & Infrastructure

  • Dubai Metro – Route 2020 connects Expo City to key areas across the city. The Expo 2020 Station serves as the final stop on the Red Line extension, offering direct rail access to communities such as Dubai Marina, Business Bay, and Downtown.

  • Major Road Access includes connections to Sheikh Mohammed bin Zayed Road (E311) and Emirates Road (E611), allowing access to Abu Dhabi, Dubai South, and central Dubai.

  • Internal Mobility Infrastructure includes planned cycling lanes, pedestrian-friendly routes, and electric vehicle facilities. These are part of the area’s broader sustainable mobility design.

  • Bus Routes and RTA services operate between Expo City and nearby residential and business zones, providing additional public transport options beyond the Metro.

  • Proximity to Al Maktoum International Airport positions the area as a logistics and business hub. The airport is located approximately 15 minutes away by car.

  • Utilities and Digital Infrastructure were built for the Expo and remain in place, including smart city features such as energy-efficient lighting, high-speed internet, and district cooling systems.

Projects: Ongoing and Completed

  • Expo 2020 pavilions have been repurposed into permanent facilities, including the Mobility and Sustainability pavilions, which now function as cultural and educational spaces.

  • Residential developments include mid-rise buildings and townhouses introduced as part of the post-Expo transformation. These off-plan projects are expected to be delivered by 2026.

  • Expo Valley and Expo Central are two key residential clusters offering apartments, villas, and plots. These are among the first residential zones launched after the event.

  • Commercial zones have been converted into offices and co-working spaces, with tenants that include international firms and startups.

  • The planning model incorporates green construction elements, including LEED-certified buildings and district cooling systems, to minimize environmental impact.

  • Property handovers are occurring in phases, with a mix of rental and freehold units. Expo City authorities lead development in collaboration with multiple local contractors.

Cultural and Social Features

  • The community retains cultural elements from the original Expo event, with repurposed pavilions hosting exhibitions, educational programs, and public events.

  • Spaces such as Al Wasl Plaza and Terra Pavilion are used for gatherings, temporary installations, and community programming.

  • The environment encourages social interaction through open public areas, shaded walkways, and shared recreational zones.

  • Events held on-site often reflect a mix of international themes, supporting a multicultural atmosphere.

  • The residential population comprises a diverse mix of nationalities, with a strong presence of South Asians, Arabs, Europeans, Pakistanis, and Indians, as well as Emiratis working in institutional or operational roles.

  • The area is still in its early residential stages, with the demographic composition expected to shift as new phases are completed.

Future Outlook & Freehold Status

Expo City Dubai is being developed as a mixed-use area that combines housing, workplaces, and public services within a single zone. Future phases will add more homes, schools, clinics, and retail options to support a growing residential base. The layout is designed to be pedestrian-friendly, with planning that incorporates sustainability and green construction practices.

Properties in Expo City are offered for sale under freehold ownership, allowing both UAE nationals and international buyers to purchase units with full ownership rights.

For those considering investment, the area may be suitable for long-term strategies, especially as more infrastructure is completed and demand from residents and businesses increases over time. The presence of metro connectivity planned schools and hospitals, and a self-contained community layout supports utility-based demand.

Prospective buyers focused on ROI should monitor delivery timelines of off-plan properties, rental market performance once more units are occupied, and broader trends in Dubai South and nearby logistics zones.

Buyer and Renter Considerations

Those planning to buy in Expo City Dubai should evaluate the delivery timelines of the new residential phases, particularly in projects such as Expo Valley and Expo Central. Most available units are off-plan, with handovers expected by 2026. Freehold ownership is available, offering long-term flexibility for both end-users and investors. Buyers may also want to consider the area’s infrastructure maturity, planned schools and hospitals, and future demand linked to nearby logistics and commercial zones.

For individuals looking to rent in Expo City Dubai, options remain limited as the residential population is still in the process of forming. Rental supply is expected to grow as more units are delivered. Renters should assess access to public transportation and retail services, as well as how the evolving infrastructure aligns with their daily needs.

Residential Trends & Planning Considerations

  • Most of the housing supply in Expo City Dubai is in the early stages of development, with many units offered as off-plan and scheduled for delivery in 2026.

  • Residential planning follows a walkable layout, with proximity to office spaces, recreational zones, and cultural landmarks.

  • Units include a mix of apartments, townhouses, and villas, with a gradual rollout based on infrastructure readiness.

  • The area is designed for multi-use living, with co-working spaces and retail planned alongside residential blocks.

  • Developers have incorporated green construction features, including district cooling and energy-efficient building systems.

  • Market demand is likely to come from professionals, small families, and institutional tenants linked to nearby business zones and Al Maktoum Airport.

  • Long-term rental trends will depend on metro connectivity, completion of essential services, and occupancy rates as more residents move in.

Governance and Development Model

Expo City Dubai is overseen by a government-led body that handles its planning and future development. Unlike other areas managed by private developers, this community adheres to a public framework, with each phase closely aligned with city-wide infrastructure plans. The coordination includes utilities, transport access, and essential services. Because the planning is handled centrally, there tends to be more consistency in how land is used and how services are introduced. For investors, this setup can provide clearer expectations regarding regulations, delivery schedules, and the rollout of key facilities, such as schools and healthcare.

Summary

  • Expo City Dubai is a redeveloped legacy site from the Expo 2020 event, now functioning as a mixed-use urban community.

  • The area features ongoing off-plan residential projects with an expected delivery date of 2026.

  • Core infrastructure is already in place, including metro access (Route 2020), public parks, and repurposed cultural facilities.

  • Community planning incorporates green construction standards and walkable layouts.

  • Properties are available for sale under freehold ownership and are open to both local and foreign buyers.

  • Individuals looking to buy in Expo City Dubai should evaluate handover timelines and surrounding development activity.

  • Those planning to rent in Expo City Dubai will find limited current supply, with more rental units expected as residential phases are completed.

The long-term investment value will depend on the completion of infrastructure, demographic shifts, and the performance of adjacent zones, such as Dubai South.

Expo 2020

0 AED

1,400,000 AED

0 AED

The average price

Master Developer

View Page

Dubai Holdings

Projects

Active Projects

1

Projects

Completed Buildings

0

Projects

Delivered Units

0

Active Developers

Number of Completed Projects

Discover Properties in Community